p is the realized pitch
Modeling math
“We’re optimizing something”
Effort.
Total risk for the utterance: r
i
is the error of the i
th
target, and s
i
is its importance.
Error for one target.
y is the i
th
pitch target.
A bar denotes an average over a target.